Baner Encroachment Demolition: What PMC Has Pulled Down Since 2025 and What Buyers Should Check
Every reported PMC demolition in Baner since 2025, with dates, roads and areas as reported, what the November 2026 drive covers for Baner, and what buyers and owners should check.

In this article 5 sections
Baner encroachment demolition has been a repeated feature of Pune Municipal Corporation (PMC) action: the PMC has pulled down unauthorised structures along Baner's main roads several times since mid-2025. The largest action we could document was on 7 November 2025, when the PMC cleared 92,535 sq ft between Medipoint Chowk and Jupiter Hospital Chowk. In November 2026 Baner is part of the PMC's citywide two-month drive, but the reports we found for that drive name the Aundh-Baner ward office, and the 25 November action they describe was on Aundh Road and Bhau Patil Road, not on Baner's own roads. This guide lists each reported action with its date, place and area as the outlets stated them, then explains what Baner buyers and owners should check.
Cover image above: an AI-generated illustration, not a photograph of an actual demolition or location.
Baner encroachment demolition, action by action
Areas are as each source reported them. "Not stated" means the article did not say.
| Date | Where | What was removed | Area reported | Notices |
|---|---|---|---|---|
| 8 or 9 July 2025 (outlets differ by a day) | Aundh-Baner Link Road, Medipoint Chowk to Vidhate Vasti Chowk, and Baner Main Road | Shops, hotels, tin sheds, permanent concrete structures | About 31,200 sq ft | 35, per Free Press Journal |
| 9 September 2025 | Both sides of Baner Main Road | Shops, hotels, tin sheds, covered terraces, permanent structures | About 19,495 sq ft | Not stated |
| 17 September 2025 (reported 18 September) | Baner and Balewadi, including Balewadi High Street and Dasara Chowk | Shops, hotels, sheds, permanent structures | About 54,375 sq ft | Not stated |
| 9 October 2025 (reported 10 October) | Aundh-Baner area, Parihar Chowk to Dr Babasaheb Ambedkar Chowk | About 60 structures: sheds, shops, hotels | About 9,500 sq ft of public land | Not stated |
| 7 November 2025 | Both sides of the road, Medipoint Chowk to Jupiter Hospital Chowk | Shops, nurseries, furniture outlets, vegetable stalls, hotels, sheds, permanent structures | 92,535 sq ft | Not stated |
| 18 December 2025 | Near River Front Society at Jupiter Chowk | Hotels, tin sheds, permanent buildings | Nearly 19,850 sq ft | About 15 earlier notices |
| 18 February 2026 | Baner-Sus Bio-Diversity Park zone, plus Kharadi and Hadapsar | Unauthorised residential and commercial structures, temporary and permanent | About 30,600 sq ft for the whole drive, Baner share not stated | Not stated |
| 6 April 2026 | Aundh-Baner near Abhiman Society and Sarja Hotel Lane, plus parts of Kondhwa Budruk | Temporary and permanent encroachments | Nearly 18,000 sq ft combined | Not stated |
Earlier, in June 2024, the PMC also demolished rooftop and pub structures in Baner, Balewadi and Koregaon Park. We have left that action out of the table because Punekar News's area figures for it do not add up.
Baner in the November 2026 citywide drive
From mid-November 2026 the PMC is running a daily drive across the city, which we cover in our guide to the Pune anti-encroachment drive. What the reports say about Baner specifically is thin:
- PuneNow reported that on 21 November the PMC acted against unauthorised street vendors along Pancard Club Road in Baner, and that on 22 November Aundh-Baner was one of six divisions in a special eviction drive.
- Pune Pulse reported that on 25 November the PMC removed about 30,200 sq ft of unauthorised structures on roads, footpaths and front margins under the Aundh-Baner ward office. The roads named were Aundh Road in Khadki and Bhau Patil Road in Bopodi. These are not Baner roads. "Aundh-Baner" is the name of the ward office.
- Punekar News reported a figure of 59,400 sq m for the Aundh-Baner ward office on the same day. That conflicts with Pune Pulse's 30,200 sq ft and gives no location, so we have not used it.
In short, we found no report that the November 2026 drive has demolished a specific building on Baner's main roads. That may change as the drive continues, and we will update this article when it does.
Why the PMC is carrying out Baner encroachment demolition
The reports give practical reasons rather than a single trigger. Reports of the July 2025 action quoted a senior PMC official saying unauthorised construction would not be tolerated, and said the cleared land would be used for public utility and road expansion to ease traffic in Baner. In October 2025 the stated aims were freeing public space and smoother traffic. For the Baner-Sus Bio-Diversity Park zone, PuneNow described the area as ecologically sensitive and reported a stern warning to developers. We found no report in which residents or housing societies were cited as the reason.
What Baner encroachment demolition means for buyers and owners
Most of the reports describe roadside commercial structures: shops, hotels, tin sheds, nurseries, furniture outlets and vegetable stalls. The February 2026 drive also removed residential structures in the Baner-Sus Bio-Diversity Park zone, Kharadi and Hadapsar, per PuneNow. We found no report of an approved apartment building in Baner being demolished, and we found no report linking these actions to property prices, so we make no claim about prices.
If you are buying or investing in Baner, these checks matter:
- Ground-floor shops and showrooms. Ask whether the frontage, canopy or extension sits inside the approved building line. Roadside extensions are what the reports describe being removed.
- Rooftop and terrace structures. Rooftop restaurants and covered terraces appear in the 2024 and 2025 actions. Ask for the approved plan and occupancy certificate for any commercial unit with a roof or terrace.
- Plots near the Baner-Sus Bio-Diversity Park. Check the zone and approvals with the PMC or your lawyer before paying a booking amount.
- The approved plan and the built area. Compare the area you are paying for with the approved plan. A Maharashtra government resolution reported by Construction World on 19 October 2026 says first sales of buildings built in violation of approved plans cannot be registered, and that registration is barred where the area exceeds the approved plan. We read this from the news report, so confirm the current rule with the Sub-Registrar.
- MahaRERA registration for any under-construction project. See our guide to checking MahaRERA registration.
- The full cost. Our stamp duty guide and property registration guide cover the charges and the documents.
Elsewhere in Pune, 2026 demolitions have also hit unauthorised multi-storey buildings where flats may already have been sold. We summarise those reports in our Pune anti-encroachment drive guide.
To compare current projects, our Baner page lists the projects we track in the area with their MahaRERA numbers.
Sources
- PMC removes 30,200 sq ft in Aundh-Baner, Pune Pulse, 25 Nov 2026
- PMC removes encroachments across seven ward offices, Punekar News, 25 Nov 2026
- Ninth-day report, PuneNow, 24 Nov 2026
- Over 92,000 sq ft in Baner, Pune Pulse, 7 Nov 2025
- Nearly 19,850 sq ft in Baner, Pune Pulse, 19 Dec 2025
- 31,200 sq ft on Aundh-Baner Link Road, Free Press Journal, 9 Jul 2025
- 19,495 sq ft on Baner Main Road, Pune Pulse, 9 Sep 2025
- Over 54,000 sq ft in Baner and Balewadi, Pune Pulse, 18 Sep 2025
- 9,500 sq ft in Aundh and Baner, Free Press Journal, 10 Oct 2025
- PMC intensifies drive, 30,600 sq ft, PuneNow, 19 Feb 2026
- Aundh-Baner and Kondhwa Budruk, Punekar News, 6 Apr 2026
- Maharashtra stops registration of unauthorised property, Construction World, 19 Oct 2026
Cover image: an AI-generated illustration made for this article. It is not a photograph of an actual demolition or location. This article is general information, not legal advice. Figures are as reported by the outlets named.
Frequently asked questions
Is Baner being demolished?
No. The reports describe unauthorised roadside and margin structures, such as shops, sheds and hotels, being removed in repeated actions. They do not describe approved residential buildings being demolished.
Which Baner roads have been affected?
Reports name the Aundh-Baner Link Road, Baner Main Road, Medipoint Chowk to Jupiter Hospital Chowk, Jupiter Chowk near River Front Society, Balewadi High Street, Dasara Chowk and Pancard Club Road.
Did the PMC give notice before demolishing?
Only two actions mention notices: about 35 for the July 2025 action and about 15 for the December 2025 action, per the articles. For the others, the articles do not say.
Is the November 2026 drive demolishing buildings in Baner?
The reports we found name the Aundh-Baner ward office, but the 25 November action described was on Aundh Road and Bhau Patil Road. We found no report of a specific demolition on Baner’s own roads in November 2026.
Will the drive continue?
The PMC has announced daily action for two months from mid-November 2026. Officials in earlier Baner actions also said such action would continue.
Projects mentioned in this article
| Project | Developer | Starting price* | MahaRERA no. | Completion (MahaRERA) |
|---|---|---|---|---|
| Kohinoor Satori | Kohinoor Group | From ₹1.6 Cr* | P52100066472 | Dec 2028 |
| The Ornate | Majestique Landmarks | Price on Request | P52100046463 | Dec 2029 |
| Kumar Panache | Kumar Corp | From ₹1.15 Cr* | P52100077734 | Dec 2027 |
*As published by the developer, before taxes and charges. "Price on Request" means the developer has not published a price. Check each project page for every registration number.




