Pune Metro Line 3 Timings, Fares & Station List (Hinjewadi to Shivajinagar)
Pune Metro Line 3 timings, fares and the full 23-station list from Hinjewadi to Shivajinagar, plus which stations are open now and when Balewadi High Street opens.

In this article 7 sections
Pune Metro Line 3 timings: trains run from 6:00 am. The last train leaves Maan (Hinjewadi Phase 3) at 10:30 pm and District Court at 11:40 pm. Trains come every 5.5–6 minutes at peak times and every 10–12 minutes off-peak. Fares are ₹12 to ₹62, and an end-to-end ride takes about 40–45 minutes. Line 3 opened on 4 November 2026 with 17 of its 23 stations. Balewadi High Street and Balewadi Phata are expected in late November or early December 2026.
This guide covers the Hinjewadi–Shivajinagar line's timings, fares, station list and which stations are open, with sources. Details are from news reports of Line 3's opening (checked 16 November 2026). Timetables can change, so confirm on the Puneri Metro app before you travel.
Pune Metro Line 3 timings and frequency
| Details | |
|---|---|
| First train | 6:00 am from both ends |
| Last train from Maan (Hinjewadi) | 10:30 pm |
| Last train from District Court | 11:40 pm |
| Peak frequency (7:30–9:30 am, 5–8 pm) | Every 5.5–6 minutes |
| Off-peak frequency | Every 10–12 minutes |
| End-to-end journey | About 40–45 minutes |
Source: Free Press Journal, 3 Nov 2026 and Trak.in, 1 Nov 2026. Some early reports gave slightly different figures (a 10:40 pm last train from District Court, 8-minute off-peak gaps), so treat the off-peak gap as approximate. We have not found a separate weekend timetable yet.
For Hinjewadi commuters, the Hinjewadi metro timings that matter are the 6:00 am first train and the 10:30 pm last train out of Maan. At peak, a train every 6 minutes means you rarely wait long at Hinjewadi Phase 1 or Wakad Chowk.
Pune Metro Line 3 fares
Fares go by distance:
| Distance | Fare |
|---|---|
| Up to 2 km | ₹12 |
| 2–4 km | ₹25 |
| 4–8 km | ₹37 |
| 8–12 km | ₹43 |
| 12–18 km | ₹49 |
| Over 18 km | ₹62 |
Sample trips:
- Hinjewadi Phase 1 to Wakad Chowk: ₹12
- Maan to Hinjewadi Phase 1: ₹37
- Wakad Chowk to District Court: ₹49
- Maan to District Court: ₹62
Line 3 is a public–private partnership, so its fares are set by the concession contract. That is why its top fare is higher than Maha Metro's ₹35 maximum on Lines 1 and 2 (Punekar News, 1 Nov 2026). The operator has said fares will be reviewed after six months.
How to pay:
- QR tickets in the app or on WhatsApp
- Station counters
- Ticket machines
- NCMC (National Common Mobility) cards
Pune Metro Line 3 station list and which stations are open
Line 3 is 23.3 km long, fully elevated, with 23 stations. It runs from Maan (Megapolis Circle) in Hinjewadi Phase 3 to District Court in Shivajinagar.
| # | Station | Status (16 Nov 2026) |
|---|---|---|
| 1 | Maan (Megapolis Circle) | Open |
| 2 | Maan–MIDC Circle Phase II | Open |
| 3 | Maan Bus Depot | Open |
| 4 | Hinjewadi Phase II Circle II | Open |
| 5 | Hinjewadi Phase II Circle I | Open |
| 6 | Padmabhushan Chowk | Open |
| 7 | Shivaji Maharaj Chowk | Open |
| 8 | Hinjewadi Phase I | Open |
| 9 | Wakad Chowk | Open |
| 10 | Balewadi Stadium (Shiv Chhatrapati Sports Complex) | Open |
| 11 | MITCON Balewadi | Open |
| 12 | R K Laxman Museum, Balewadi | Open |
| 13 | Balewadi High Street | Expected late Nov–early Dec 2026 |
| 14 | Balewadi Phata | Expected late Nov–early Dec 2026 |
| 15 | Baner Gaon | In stages, by January 2027 |
| 16 | Baner–Pashan Link Road | In stages, by January 2027 |
| 17 | Aundh | Open |
| 18 | Sakal Nagar | Open |
| 19 | Savitribai Phule Pune University | Open |
| 20 | Bhosale Nagar (RBI) | In stages, by January 2027 |
| 21 | Agriculture College | Open |
| 22 | Shivajinagar (Simla Chowk) | In stages, by January 2027 |
| 23 | District Court | Open |
Status source: Punekar News, 31 Oct 2026, quoting PMRDA. Trains pass through closed stations without stopping.
Is Balewadi High Street metro station open?
Not yet, as of 16 November 2026. PMRDA has said Balewadi High Street and Balewadi Phata should open in late November or early December 2026, after safety clearance. Until then, the nearest open stations are R K Laxman Museum and MITCON Balewadi, both a short ride or walk away. We will update this page when the stations open.
Is Baner metro station open? Baner Gaon and Baner–Pashan Link Road are also still closed and are due in stages by January 2027. For Baner, use R K Laxman Museum (Balewadi side) or Aundh.
Is Aundh metro station open? Yes. Aundh, Sakal Nagar and University stations opened on 4 November.
Is Wakad Chowk metro station open? Yes, Wakad Chowk is open.
Changing to Lines 1 and 2 at District Court
District Court is the interchange with Maha Metro's Line 1 (PCMC–Swargate) and Line 2 (Vanaz–Ramwadi). A foot overbridge of about 150 m links the stations. Tickets are not fully integrated yet: you need separate QR tickets for Line 3 and for Maha Metro, though an NCMC card works at both gates (Free Press Journal).
Parking and feeder buses
- Parking: PMC has built parking of about 30,000 sq ft at Balewadi and about 21,000 sq ft at Baner. Other planned lots are not open yet.
- Feeder buses: no PMPML feeder routes had been announced at launch.
- Ridership: Line 3 carried about 2.65 lakh passengers in its first 8 days, even with the Diwali break (Punekar News, 14 Nov 2026).
What Line 3 means if you are buying a home
The line ties Hinjewadi's IT parks to Wakad, Balewadi, Baner, Aundh and the city centre. Homes within a short walk of an open station gain the most day-to-day value. Our Pune Metro Line 3 property guide looks at which micro-markets benefit and how prices have moved.
If you want to live near a station, start with:
Frequently asked questions
What are Pune Metro Line 3 timings?
Trains start at 6:00 am from both ends. The last train leaves Maan (Hinjewadi Phase 3) at 10:30 pm and District Court at 11:40 pm. Trains come every 5.5–6 minutes at peak and every 10–12 minutes off-peak.
What is the fare on Pune Metro Line 3?
Fares go by distance, from ₹12 for up to 2 km to ₹62 for over 18 km. Maan to District Court costs ₹62 and Wakad Chowk to District Court ₹49.
Is Balewadi High Street metro station open?
Not as of 16 November 2026. PMRDA expects Balewadi High Street and Balewadi Phata to open in late November or early December 2026. Use R K Laxman Museum or MITCON Balewadi stations until then.
How many stations are open on Pune Metro Line 3?
17 of 23 stations opened on 4 November 2026. Balewadi High Street, Balewadi Phata, Baner Gaon, Baner–Pashan Link Road, Bhosale Nagar and Shivajinagar are due to open in stages by January 2027.
Can I change from Line 3 to the other Pune metro lines?
Yes, at District Court, which connects to Maha Metro Line 1 (PCMC–Swargate) and Line 2 (Vanaz–Ramwadi) by a 150 m foot overbridge. You need separate QR tickets, but an NCMC card works on both.
Projects mentioned in this article
Joyville Sensorium
Shapoorji Pallonji · Maan, near Hinjewadi Phase 1, Pune
2 & 3 BHK Apartments · From ₹89.27 L*
Kohinoor Satori
Kohinoor Group · Mahalunge (New Baner), Pune
3, 4 & 4.5 BHK Apartments · From ₹1.6 Cr*


