Ready Reckoner Rate Pune 2026-27: Area-Wise Rates and How to Check
Ready reckoner rate Pune 2026-27: rates are unchanged from 2025-26. Area-wise examples, how to check your rate on IGR Maharashtra's eASR, and how the RR value sets your stamp duty.

In this article 8 sections
Ready reckoner rate Pune 2026-27 in one line: unchanged from 2025-26. On 31 March 2026, Maharashtra announced a zero per cent revision for the year from 1 April 2026, so the rates set in April 2025 still apply across PMC, PCMC and Pune district. This guide explains how the ready reckoner rate Pune buyers face is set, how to look up your exact rate on IGR Maharashtra. It also shows how the rate decides your stamp duty, with a worked example.
What is the ready reckoner rate?
The ready reckoner rate (RR rate), officially the Annual Statement of Rates (ASR), is the minimum value the Maharashtra government assigns to property in each zone. The Department of Registration and Stamps (IGR Maharashtra) publishes it every year, in rupees per square metre, with separate rates for:
- Open land
- Residential flats
- Offices
- Shops
- Industrial units
It matters because stamp duty is charged on the higher of your agreement value and the ready reckoner value. If you buy below the RR value, you still pay duty on the RR value, and there can be income tax consequences too (see below).
Ready reckoner rate Pune 2026-27: no change
- 2026-27: the state kept rates unchanged from 1 April 2026, after earlier expectations of a 4–5% rise. A proposed rise of about 10% for Pune was dropped. Only technical corrections were made, such as adding new survey numbers (Free Press Journal, 31 Mar 2026).
- 2025-26 (still in force): rates rose by an average of 4.39% statewide (excluding Mumbai) from 1 April 2025, the first revision in two years. Pune city (PMC) went up 4.16% and Pimpri-Chinchwad (PCMC) 6.69% (Free Press Journal, 1 Apr 2025).
So if you look up a rate on the eASR portal, the 2025-26 figure is the one that applies to a deal registered today.
Area-wise ready reckoner rates in Pune
Rates are set per sub-zone, not per suburb, so two buildings in the same area can have different rates. As a guide, these were among Pune's highest flat rates after the 2025 revision (Free Press Journal, 2 Apr 2025):
| Area | RR rate for flats (₹ per sq m) | About ₹ per sq ft |
|---|---|---|
| Koregaon Park | ₹1,79,490 | ₹16,675 |
| Prabhat Road | ₹1,65,220 | ₹15,350 |
| Model Colony | ₹1,46,190 | ₹13,580 |
| Kothrud | ₹1,21,540 | ₹11,290 |
We have not printed rates for Baner, Wakad, Hinjewadi or Kharadi because published figures differ widely between websites and rarely name the sub-zone or year. Look up your exact survey number on the portal (steps below). For market prices, which are usually well above RR rates in newer suburbs, see our area-wise flat rates in Pune.
How to check the ready reckoner rate Pune online (eASR)
- Go to IGR Maharashtra and open eASR (Annual Statement of Rates) under Online Services.
- Choose the year. The 2025-26 rates continue for 2026-27.
- Click Pune on the district map.
- Select the taluka: Haveli covers most of PMC and PCMC, and Mulshi covers Hinjewadi and Maan.
- Select the village or the corporation zone, then the sub-zone or survey number from your agreement or 7/12 extract.
- Read the rate for residential flats (or land, shop or office) in ₹ per sq m.
If the property's survey or CTS number is not obvious, it is printed on the agreement and on the Index II of any earlier sale. The MahaRERA project page also lists the survey numbers for new projects.
How the RR value of a flat is calculated
Under the ASR guidelines, the flat rate applies to built-up area, taken as carpet area × 1.2. The guidelines then adjust for the floor and the building's age. The figures below are from the published ASR guidelines; check the current year's guidelines on IGR for your case.
| Adjustment | Rule |
|---|---|
| Building with a lift, ground to 4th floor | No change |
| 5th to 10th floor | +5% |
| 11th to 20th floor | +10% |
| 21st floor and above | +15% |
| Age 0–2 years | 100% of rate |
| Age 5–10 years | 90% |
| Age 10–20 years | 80% |
| Age 20–30 years | 70% |
Worked example
Take a 3rd-floor flat in Kothrud with 800 sq ft carpet area, bought for ₹1 crore:
- Carpet area: 800 sq ft = 74.3 sq m
- Built-up area: 74.3 × 1.2 = 89.2 sq m
- RR value: 89.2 × ₹1,21,540 = about ₹1.08 crore
The RR value is higher than the ₹1 crore price, so stamp duty is charged on about ₹1.08 crore. At 7%, that is about ₹7.59 lakh instead of ₹7 lakh.
For a new flat in a newer suburb, the agreement value is usually above the RR value, so the duty is simply charged on your price. Use our stamp duty calculator to work out the total. Our stamp duty in Pune 2026 guide explains the 7% (men) and 6% (women) rates and the ₹30,000 registration cap.
When you buy below the ready reckoner rate
Paying less than the RR value is legal, but:
- Stamp duty: duty is still charged on the RR value, as in the example above.
- Tax for the buyer: if the RR value is more than 110% of the price, the difference can be taxed as the buyer's income.
- Tax for the seller: the seller's capital gain is worked out on the RR value instead of the price.
The 10% tolerance has applied since 2020 under sections 50C and 56(2)(x) of the Income-tax Act 1961. Those provisions carry into the new Income-tax Act 2025 from 1 April 2026 under new section numbers, so ask your tax adviser to confirm the treatment for your deal.
This mostly matters for resale flats in older buildings, plots, and distress sales, where prices can dip below the RR value.
Quick answers
- Did ready reckoner rates go up in April 2026? No. Maharashtra kept them unchanged for 2026-27.
- Is the ready reckoner rate Pune uses the same as the market rate? No. The RR rate is a government floor value for stamp duty. In most Pune suburbs, market prices are higher.
- Where do I pay stamp duty? Through the GRAS portal or the sub-registrar at registration. Our property registration guide walks through the day.
Need help checking the RR value or the total cost of a flat you are considering? Talk to our team.
Official sources
We checked the figures in this article against these official pages. Rules, fees and timetables change, so confirm on the source before you act.
Frequently asked questions
What is the ready reckoner rate in Pune for 2026-27?
It is unchanged from 2025-26. Maharashtra announced a zero per cent revision from 1 April 2026, so the rates set in April 2025 still apply. Look up your exact sub-zone on IGR Maharashtra’s eASR portal.
How much did ready reckoner rates rise in Pune in 2025?
From 1 April 2025, rates rose 4.16% in Pune city (PMC) and 6.69% in Pimpri-Chinchwad (PCMC). The statewide average excluding Mumbai was 4.39%.
How do I check the ready reckoner rate for my flat?
On igrmaharashtra.gov.in, open eASR, choose the year, click Pune district, then select the taluka, village or zone and the survey number. The table shows the rate for residential flats in rupees per square metre.
Is stamp duty charged on the ready reckoner rate or the agreement value?
On whichever is higher. For most new flats the agreement value is higher. For resale flats or plots sold below the RR value, stamp duty is charged on the RR value.
How is carpet area converted for the ready reckoner value?
The ASR guidelines treat built-up area as carpet area × 1.2. The flat rate is applied to that, then adjusted for floor (for example +5% from the 5th to 10th floor with a lift) and building age.
Projects mentioned in this article
| Project | Developer | Starting price* | MahaRERA no. | Completion (MahaRERA) |
|---|---|---|---|---|
| Kalpataru Blossoms | Kalpataru | From ₹1.62 Cr* | P52100077659 +2 more | Mar 2029 (Towers 1 and 2) |
| Nyati Emerald | Nyati Group | From ₹1.25 Cr* | P52100051235 +2 more | Feb 2027 (Phase II), May 2027 (Phase I), Aug 2028 (Phase III) |
| Kumar Panache | Kumar Corp | From ₹1.15 Cr* | P52100077734 | Dec 2027 |
*As published by the developer, before taxes and charges. "Price on Request" means the developer has not published a price. Check each project page for every registration number.